The brief: make the unknown known
Reclaimed stair parts are rarely a simple line item. Sellers price and assemble lots based on condition, species, provenance, and the work required to make pieces fit a modern job. Your RFQ should remove as much uncertainty as possible: give the supplier a clear scope, measurable expectations for appearance and structural soundness, and a realistic acceptance process at delivery. That saves time, reduces disputes, and keeps a restoration schedule from slipping.
Think of the RFQ as a contract proposal for a material lot. The more specific you are about which parts, the tolerances you accept, and how you’ll inspect them on arrival, the closer the quote will be to the final installed result.
Essential information to include up front
Project identifiers: job address, owner or GC contact, restoration phase and target install date. Reclaimed deliveries need lead time and often hand-unloading.
Scope and quantities: list every part you expect—treads, risers, bull-nosed treads, handrails, newel posts, balusters (turned or square), trim returns, and landing components. Provide counts and nominal dimensions for each type rather than a single board‑foot total.
Reference photos and drawings: include clear photos of existing stairs from multiple angles plus any measured elevations, section details, and the stair profile you’re matching. A marked-up photo showing the location of each part helps suppliers assemble an appropriate lot.
Appearance targets: specify species or look (e.g., reclaimed oak with cathedral grain, mixed hardwoods acceptable, or match to existing stained cherry). If you require an exact species ID, say so—trade names can mean different things.
Condition and structural expectations: decide whether parts must be sound and ready to install, or whether repairs, flattening, and surfacing are acceptable. Call out unacceptable conditions (active insect damage, rot, excessive checking) and acceptable defects (nail holes, small patched cracks).
Component-level details that matter to fabricators
Dimensions and tolerances: give nominal finished dims you need (finished tread width, nosing profile, riser height) and acceptable machining allowance. For example: “Treads: 11" finished width, 1 1/8" finished thickness; supplier to leave minimum 1/8" extra on faces for surfacing, or deliver fully surfaced.”
Profiles and edge details: attach a section drawing or profile photo of the riser-to-tread junction and the nosing radius. If you plan to reprofile on-site, note that so the supplier doesn’t try to match a factory profile.
Newel posts and balusters: provide turned section drawings or sample pieces. Turned parts vary greatly—request matching lots or a test sample to confirm turning allowances, grain orientation, and diameter.
Joinery and machining: state if you want parts pre-cut for stringers, with mortises or tenons for newel posts, or simply rough-cut blanks. Pre-machined components reduce site labor but increase up-front cost and require precise field verification.
Appearance, matching, and acceptance criteria
Define appearance metrics in plain language: color range, grain character, presence and acceptable size of historical patina, and the maximum number and size of old nail holes or repairs allowed. Provide reference photos labeled “acceptable,” “preferred,” and “reject.”
Be explicit about matching strategy: do you need a visual match to an existing tread on the main run, or is a consistent lot appearance acceptable if the original will be retained as a sample? If matching takes precedence, require the supplier to provide sample pieces or a swatch board before final pull.
Acceptance testing: specify how you will inspect on receipt (random sampling, full inspection, or staged acceptance after surfacing). Include remedies for non-conformance (credit, replacement, or on-site repair allowance). Give the supplier a reasonable cure period to make repairs.
Logistics, delivery, receiving, and storage notes
Packing and labeling: require each component type be banded and labeled with job name, component type, and a lot number. This saves hours on-site and prevents misplaced pieces.
Delivery constraints: mention site access, required lift equipment, and preferred delivery windows. Reclaimed lots often ship on pallets or in crated bundles; let the supplier know if experienced riggers are unavailable on your end.
Inspection on arrival: list who will inspect shipments and where. If you want photos before acceptance, state that. For historical work, require the supplier to mark obviously unacceptable pieces for immediate return or credit.
Storage and acclimation: reclaimed wood should be kept dry and out of direct sun. Give the supplier or shipper instructions if you need staged deliveries to avoid long on-site exposure.
How to measure, estimate yield, and plan allowances
Inventory accuracy matters: reclaimed treads and balusters vary in usable face width and straightness. Ask suppliers to provide counts by usable dimension (e.g., number of treads usable at 11" finished width) rather than gross piece counts.
Yield and waste allowances: specify a waste allowance per component or request the supplier’s recommended yield estimate for your requested sizes. When matching older stair profiles, increased waste is normal; budget for extra pieces or a contingency lot.
Samples and trial fits: for critical matches—such as the front-most tread or a prominent newel—order a small sample or a pre-approval sample pack. A trial surfacing or profile cut on a sample can reveal hidden issues before the whole lot is milled or delivered.
BEFORE YOU REQUESTYour sourcing checklist.
- Include project address, install date window, and contact for deliveries.
- List each reclaimed component separately with nominal finished dimensions and quantities.
- Attach photos, measured elevations, and a profile section for the nosing and riser detail.
- State species preferences or acceptable appearance ranges and whether species ID is required.
- Define condition and acceptance criteria (no active rot, acceptable nail holes, surface patina allowed, etc.).
- Decide whether components should be delivered rough, pre-surfaced, or pre-machined.
- Request yield estimates and allow a waste contingency; consider ordering samples.
- Specify packing, labeling, delivery constraints, and on-site inspection procedure.
Common questions.
Can I expect reclaimed stair parts to match exactly?+
Not always. Reclaimed material is variable by nature. If an exact visual match is essential, require the supplier to provide pre-approval samples taken from the same lot or to identify pieces that match a retained sample piece. Expect some variation and plan on a finish strategy that unifies color and sheen.
Should reclaimed parts be delivered rough or ready-to-install?+
That depends on your shop capacity and the condition of the parts. Delivering rough with surfacing left for the shop gives you control but increases yield loss and labor. Pre-surfaced and profiled parts reduce on-site work but require precise measurements and may limit the supplier pool.
How do I specify acceptance on delivery?+
Spell out whether you’ll perform a full inspection, random sampling, or accept on sight with post-delivery inspection window. Include remedies for non-conformance—credit, replacement, or agreed repair—and a cure period for the supplier.
Do I need to worry about species identification?+
Yes—trade names can be ambiguous. If the species affects durability, color, or finish behavior, require the supplier to confirm botanical identity or clearly state that appearance is the primary concern.
How should I handle hidden defects like embedded iron or rot?+
Require suppliers to disclose visible repairs and to flag suspect pieces. For concealed defects, build a contingency into your waste allowance and request a small surplus. Consider a trial surfacing sample to reveal hidden issues early.
Can the supplier pre-machine joinery for modern stringers?+
Yes, but only when field measurements are confirmed. Pre-machining saves time but transfers the risk of measurement error to the buyer. If you request pre-machining, include approved shop drawings and a dimensional sign-off step in the RFQ.